Civil Works

Year

Contracting Authority

Project Designation

Consistency of Work

1996

SNCFT

Reinforcement of the bridge  KP 331+600 line 11  on  Oued Hatab

Construction of a retaining wall, protecting banks and foundations of the bridge

1996

SNCFT

Reinforcement of the bridge  KP 314+600 line 6  on  Oued Eddarb

Construction of retaining wall, protecting banks and foundations of the bridge,

construction of a spillway sill in the bed of the river

1999

SNCFT

Protection of the line 13 against the floods

Construction of 13 hydraulic structures (scuppers multicellular) under the railway with a hight  of water of 1 m and 1.5 m and widths varying between 8 m and 20 m

1999

MINISTERE DE L'EQUIPEMENT ET DE L'HABITAT

Coverage Section of Canal Oued Ezzit

Coverage of the rainwater channel by a slab

of 18 m x 12 m placed on two walls

2006-2008

ANGed

Construction of leachate treatment plants

Civil works of five leachate treatment plant (cities of

Bizerte, Sfax, Gabes, and Djerba Medenine) by

subcontracting with the Tunisian company SEGOR.